The ADU Permit Process in California

What it takes to get an ADU permitted in California: how long each stage runs, which state laws apply, and what your specific city requires.

The ADU Permit Process

Every ADU needs a building permit, zoning clearance, and Title 24 energy compliance before construction starts. Here's how that plays out, start to finish.

Regular permit

4-6 Months

Pre-approved plan

2-3 Months

A pre-approved plan has already passed city design review: no separate review fee, near-certain approval, and 4-8 weeks faster than a regular permit.

  1. Application

    1 week

    Apex Homes submits your project details and initial documents to the city.

  2. Plan Check

    4-6 weeks

    The city reviews drawings against zoning, setbacks, and Title 24 rules.

  3. Corrections

    2-4 weeks

    If comments come back, Apex Homes resolves them and resubmits on your behalf.

  4. Permit Issued

    1 week

    Fees are paid and the city issues your official building permit.

  5. Inspection

    During build

    City inspectors check the build at each construction milestone.

  6. Move-In Ready

    Final sign-off

    Certificate of occupancy is issued and your ADU is ready to use.

California State Laws, Explained Simply

What Made Building an ADU Easier, Faster, and More Valuable

Permit timeline

SB 543

Effective January 2026, it puts your city on a clock: 15 business days to tell you whether your application is complete, then a 60-day window to approve or deny. If the city claims your submission is incomplete, you can now formally challenge that before a planning commission.

What changed in 2026

Junior ADUs

AB 1154

If a junior ADU has its own private bathroom, the requirement to live on site goes away. That matters if you are weighing an interior conversion instead of a detached backyard unit.

ADU vs. JADU

Coastal & rebuild

AB 462 & AB 818

AB 462 sets a firm 60-day deadline on coastal permit decisions. AB 818 lets wildfire rebuilds move into a detached ADU before the main house is finished, with those permits fast-tracked to roughly 10 business days.

2026 law roundup

Transit corridors

SB 79

Aimed at larger multifamily near transit rather than at detached ADUs. But if your home sits near a major transit stop, it can affect your land value and your long-term options.

2026 law roundup

Permit Directory

California sets a baseline every city has to honor. Your city then layers its own process and review times on top.

Statewide Baseline

Size

At least 800 sq ft

Regardless of lot-coverage limits. On request, at least 850 sq ft for a studio or one-bedroom, or 1,000 for two-plus bedrooms.

Setbacks

4 ft side & rear

From your side and rear property lines for a detached ADU.

Height

16-18 ft

Up to 16 ft for a detached ADU, or up to 18 ft near transit or on a multifamily lot.

City review

15 + 60 days

Under SB 543, 15 business days to confirm your application is complete, then 60 days to decide.

Not sure what your lot allows? A free estimate includes zoning, setbacks, and buildable size for your specific parcel.

City Permit Directory

Find your city for its local permit path, review times, and pricing.

Apex Homes floor plans are already approved with this city. Ask what that changes for your timeline.

FAQs

Frequently Asked Questions

Can I build an ADU without a permit?

No. California requires a permit for every type of ADU, including detached units, attached units, garage conversions, and JADUs. Skipping it can lead to stop-work orders, fines, and problems when you refinance or sell, since lenders often will not count unpermitted square footage. The good news: Apex Homes handles the entire permitting process for you, from the application to plan check corrections and inspections.

Read more

What is Title 24 and does my ADU need to comply?

Title 24 is California's collection of building standards. Part 6, the California Energy Code, sets energy-efficiency rules for insulation, windows, HVAC, water heating, lighting, ventilation, and solar. Yes, your ADU has to meet the requirements that apply to its project type and location. A new detached ADU is treated as new construction and commonly needs solar, while a garage conversion follows the rules for alterations. Every Apex Homes project includes the Title 24 energy report and solar design.

Read more

What's the difference between an ADU and a JADU?

An ADU is a self-contained home on the same lot as your house: detached, attached, or a garage conversion, with its own kitchen, bathroom, and entrance, up to 1,200 sq ft for a detached unit. A JADU is capped at 500 sq ft and must be built inside your existing home. It needs its own entrance and at least an efficiency kitchen, but it can share a bathroom with the main house. Since January 2026, the owner only has to live on site if the JADU shares that bathroom.

Read more

What utility connections does an ADU require?

Every ADU needs electricity, water, and sewer. Gas is optional, and most new ADUs go all-electric. In San Jose and most Bay Area cities, a detached ADU usually gets its own electrical panel and meter, while water and sewer typically extend from the main house, as long as the sewer lateral has the capacity and a dedicated cleanout. Combined hookups commonly run $8,000 to $23,000 or more depending on your site. Apex Homes starts the PG&E application before permits are final, so utility work runs alongside construction instead of after it.

Read more

Can my HOA stop me from building an ADU?

No. Under AB 670 and Civil Code Section 4751, an HOA cannot ban or unreasonably restrict an ADU on a single-family lot. It can still apply published design standards, such as a matching architectural style, approved colors and materials, landscaping, and setbacks up to the state limit of 4 feet. It cannot require you to live on the property or ban long-term rentals. Condo associations can be treated differently, so get legal advice if that is your situation.

Read more

How much do ADU permit fees cost?

ADU permit costs in California typically range from about $1,000 to $30,000, depending on your city, the size of the ADU, and the scope of work. They usually cover plan check, the building permit and inspections, impact fees, and utility connection charges. ADUs under 750 sq ft are exempt from development impact fees, and pre-approved plans lower plan check costs. Our free estimate breaks down the fees for your specific city.

Read more

Find out what your property allows

Zoning, buildable size, and permit path for your lot, in one call, at no cost.