749 SQFT | 2B2B

Service:
DesignPermitBuildFinish Materials

Overview

This project adds a detached, single-story 749 sq ft, 2 bed / 2 bath ADU to an 11,130 sq ft San Jose lot with a 1,425 sq ft main house. An existing detached garage was fully demolished to make room for the new unit, which sits at the front right corner of the lot. A new garage was placed on the opposite side of the main house near Arnold Way, with a new driveway off Downing Avenue.

The build follows Apex Homes’ standard, pre-approved 749 sq ft 2 Bed / 2 Bath floor plan, with a complete utility buildout. The ADU has new water and sewer line connections, plus a dedicated electric meter and 200A panel on a separate overhead service, independent of the main residence.

Finish details include a tempered glass shower door, a sliding door in each bedroom, Dove Gray cabinetry and vanities, and a 240V outlet in every bedroom. A 1.87 kWdc solar PV system comes standard with the pre-approved package. The homeowner built the ADU first so it can serve as a quiet, independent office while the main house remodel moves forward.

High-End Features

  • Full Electrical Service Upgrade: The existing 110A main house panel was upgraded to 200A, paired with a brand new, fully independent electric meter dedicated to the ADU.
  • Walk-In Shower with Dual Tempered Glass Doors: A walk-in shower enclosure finished with two tempered glass doors.
  • Client-Selected Ceramic Shower Tile: Custom ceramic tile on the shower walls, selected and supplied by the homeowner.
  • White Kitchen and Bath Cabinetry: Clean white cabinetry throughout the kitchen and bathroom.
  • Sliding Window Package: Sliding windows throughout for a streamlined, low-maintenance look.
  • Dark Gray Trim and Fascia: Exterior trim and fascia finished in dark gray for a crisp, modern contrast.
  • Solar-Ready PV System: Built with a 3.69 kWdc PV system as part of the standard pre-approved design.
  • Apex Homes Standard 991 3B2B Floor Plan: Built on our pre-approved 991 sq ft 3 Bed / 2 Bath design, using masterfile #24-074483.

FAQs

Can you build an ADU before remodeling the main house?

Yes. Many homeowners build the ADU first so they have a finished, livable space before construction starts on the main house.

On this project, the homeowner built the 749 sq ft ADU first and plans to use it as a dedicated office during the main house remodel, away from the noise and disruption next door.
Plan the sequence early with your design team. Building the ADU first can affect site layout, utility routing, and the overall timeline for both projects.


Can You Tear Down An Old Accessory Structure To Build An ADU?

Yes. This project removed an 850 sq ft accessory structure after an asbestos survey cleared it. One thing to weigh first: San Jose doesn't cap the size when you convert an existing detached structure, but a new build has to follow the lot's size limit.


Does an ADU always need its own separate electric meter?

Not always, some ADUs run on a sub-meter off the main house panel. But when the main house panel doesn't have enough spare capacity, a fuller upgrade is often the better path.
On this project, the existing 110A main house panel was upgraded to 200A, and the ADU was given its own brand new, fully independent electric meter separate from the main residence.
Panel capacity is one of the first things to evaluate during ADU design, since it directly affects both project cost and timeline.

Let’s Build Your Dream Home Together

You’ve seen what’s possible—now let Apex Homes handle the details. From initial concept to precision construction, we build custom homes tailored perfectly to your lifestyle and future goals.

  • Free initial consultation & design review
  • Transparent pricing & detailed milestones
  • Expert local craftsmanship & end-to-end management
Book a Free Consultation